ANOTHER BRIDGE PLAN: Woodley Lane Structure for Q Street Crossing. CONSIDERING THE EXPENSE Engineer Douglas to Report on Practicability and Cost of Moving and Rebuilding in New Position -- Chances for an Entire New Bridge -- Whole Matter Likely to Go Over Present Session.
The Washington Post (1877-1922); Washington, D.C.. 10 Feb 1905: 10.
You might have access to the full article...
Try and log in through your library or institution to see if they have access to the full text.
