Content area
Full Text
Telus House Toronto in downtown Toronto has achieved LEED (Leadership in Energy and Environmental Design) Canada Platinum certification for Existing Buildings: Operations and Maintenance.
Completed Oct. 29, 2009, 25 York St. includes such features as raised floor cold air delivery, deep water cooling, built-in blinds and perimeter radiant panels.
The 781,236-square-foot building includes 29 floors of...