• Full Text
  • Scholarly Journal

Construction of a heuristic architecture of a production line management system in the JSW SA Mining Group in the context of output stabilization, quality improvement and the maximization of economic effects

. 
; Warsaw Vol. 37, Iss. 4,  (2021): 219-238.
DOI:10.24425/gsm.2021.139746